Production and Master Production Scheduling Workbenches

Posted on: February 25, 2010 | By: SuperUser Account | QAD Business Process

During the CAUG and QAD Teamwork meetings this past week, I came away quite excited about the new Master Scheduling and Production Scheduling workbenches that will be released later this year for both SE and EE running the .NET interface. These workbenches will offer intuitive, visual drag and drop features that I believe planners will find very impressive. Additionally, the workbench will incorporate component availability checks, ensuring that the schedule is achievable from both a material and capacity standpoint. Any QAD user that is currently scheduling using offline tools (Excel, Access, etc.), should assess these workbenches as soon as they become available as they should have a positive impact in any planning environment.