Saturday, February 04, 2012
You must be logged in and have permission to create or edit a blog.

Blogs

Mar 3

Written by: Hall
3/3/2010 7:04 AM  RssIcon

We are working with a real estate services firm that has implemented an ERP backbone in Europe. They have done a thorough job of standardizing and documenting their processes and procedures, knowing that they will be acquiring and absorbing other similar companies in the future to foster growth. As we prepare to help them roll out a U.S. division onto the same ERP backbone and process model, the foresight in defining and implementing a standardized process model, which is actually in use, has drastically reduced the expected time required for subsequent rollouts.
Time savings in the U.S. will be in the upfront design, which is already complete based on a previously implemented model in Europe. Additionally, previously prepared procedure and end user training documentation will be heavily leveraged. Although seemingly a required step in any implementation, preparation of these design standards with an eye toward future rollouts will improve the quality of the design documentation and add future value through implementation cost reductions to future rollouts.

Tags:
Categories:

Your name:
Gravatar Preview
Your email:
(Optional) Email used only to show Gravatar.
Your website:
Title:
Comment:
Security Code
CAPTCHA image
Enter the code shown above in the box below
Add Comment   Cancel 

 

Logan Consulting Blog
Logan Consulting News
Colin Powell to Speak at Convergence in Houston
1/19/2012 4:47:00 PM
Microsoft Dynamics GP
Microsoft Dynamics GP Optimization Document
1/18/2012 1:34:00 PM
Microsoft Dynamics GP
Microsoft Dynamics GP - Statement of Direction Released
1/18/2012 1:05:00 PM
AX
Simplicity: Powerful New Administrator Tools in Microsoft Dynamics AX 2012
1/17/2012 10:01:00 PM
Microsoft CRM
Microsoft CRM Browser Support
1/16/2012 3:32:00 PM
Microsoft CRM
Microsoft CRM 2011 Update Release
1/16/2012 2:52:00 PM
AX
Financial Reporting for MS Dynamics AX 2012
12/9/2011 9:41:00 AM
QAD Distribution
Breaking Out a Summarized GL Transaction
8/21/2008 5:25:00 AM
QAD Distribution
Allocating Sales, COGS and Inv. from a Central Warehouse to a Production Plant
6/5/2008 5:44:00 PM
Logan Consulting News
Coming Soon to the Logan Consulting Website- Video Testimonials!
5/28/2008 11:01:00 AM

Search